14:38:15
WarningInbound queue spike detected at Gate A
Queue length increased from 2 to 3 after concrete convoy arrival.

PROJECT NAME
CURRENT TIME
20:12:59
Last Update: 20:12:30
Expanded monitoring view for vehicle presence, camera coverage, movement flow, and active site alerts.
Active Vehicles on Site
Vehicles Waiting at Gates
Current Queue Length (Gate A)
Current Queue Length (Gate B)
Entry-to-Exit Ratio
Active Vehicles on Site
Normal8 inbound logistics vehicles, 4 internal transport units
Vehicles Waiting at Gates
Normal3 assigned to Gate A, 2 assigned to Gate B
Current Queue Length (Gate A)
WarningCongestion threshold nearing inbound concrete lane limit
Current Queue Length (Gate B)
NormalOutbound clearance running inside target threshold
Entry-to-Exit Ratio
NormalExit flow is stable relative to current intake
Last camera capture: 14:41:08
OCCUPANCY
68%
MOVEMENT RATE
14 vehicle events / hr
CAMERA VISIBILITY
Clear
Last camera capture: 14:40:32
OCCUPANCY
88%
MOVEMENT RATE
11 vehicle events / hr
CAMERA VISIBILITY
Partial occlusion near checkpoint
Last camera capture: 14:39:57
OCCUPANCY
54%
MOVEMENT RATE
7 unloading cycles / hr
CAMERA VISIBILITY
Clear
Last camera capture: 14:40:44
OCCUPANCY
61%
MOVEMENT RATE
9 vehicle events / hr
CAMERA VISIBILITY
Glare compensation active
14:38:15
WarningQueue length increased from 2 to 3 after concrete convoy arrival.
14:34:40
UpdatedCargo manifest matched expected precast delivery for Section C.
14:28:42
NormalOutbound route reopened with no residual lane blockage detected.